Search

Package No. 5: "Consulting services: Research, adjustment and updating of urban railway network planning according to the TOD mode" under Preparation for investment in Hanoi Metro Line 3 Project, Hanoi Station - Hoang Mai section and support for the development of an integrated urban transport system for urban railway projects using ODA non-refundable grant from the EU and ADB

rei

General Information

Vietnam
   Hanoi
   Package No.5
   Oct 1, 2024
Oct 21, 2024
  
VIETNAM - Hanoi Metropolitan Railway Management Board (MRB)
   6.1 Eligibility

- Eligibility criteria to AFD financing are specified in sub-clause 1.3 of the "Procurement Guidelines for AFD Financed Contracts in Foreign Countries", version October 2019, available online on AFD’s website: http://www.afd.fr.
- The Applicant commits to be listed on the eGP of the Government before approving the Applicant selection result; or providing the Applicant's registration number on the eGP of the Government of Vietnam (in case it has been registered) (refer to Point 1(d), Article 5 – Conditions of Contractors for the Law on Bidding No. 22/2023/QH15 dated June 23, 2023 of the National Assembly).
- The foreign Applicant commits to enter into a joint venture with a local consultant or use a local subconsultant(s), unless the local consultant is incapable of handling in any part of the services of the bidding package. (refer to Point 1(i), Article 5 – Conditions of Contractors for the Law on Bidding No. 22/2023/QH15 dated June 23, 2023, of the National Assembly). In case of a joint venture with local consultant, the foreign Applicant shall submit supporting documents as prescribed in Section 5.1 above.
- Effectiveness of the Expressions of Interest.

6.2 Capability, experience of Applicant
Determination of the similarity of the experiences will be based on completed Service Contracts with a completion acceptance date within the last ten (10) years from 2024:
- This includes formulating transportation planning; formulating urban planning;
- Technical area and expertise - Includes formulating master plan of railway system; formulating TOD urban planning;
- The Applicant's knowledge of Vietnamese laws related to transportation planning and urban planning;
- Applicant’s Expressions of Interest shall be evaluated and scored according to the Evaluation Criteria (details as in Appendix 2).


For detailed requirements, please refer in the attached REOI document.
   English
   International procurement
42163201080 VND
   published: Oct 1, 2024

Contact Information

   Ban Quan ly duong sat do thi Ha Noi UBND TP Ha Noi
Hanoi Metropolitan Railway Management Board (MRB)
CC2 Building, Dong Tau Urban Area, Thinh Liet Ward, Hoang Mai District, Hanoi, Vietnam, 100000.
Ha Noi 100000
Vietnam
   +842439435127
   Click here
   https://mrb.hanoi.gov.vn/

Assignments

Urban planning services Railway transport services Urban planning and landscape architectural services Construction management services

Bidding documents and attachments

 
  • Solicitation: REQUEST FOR EXPRESSIONS OF INTEREST (8 MB; Oct 1, 2024)
     Download documents

Original Text


More information: Click here
Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any suggestions for updates/corrections for this notice, please let us know.