Provision of Lot 1: Execution of works on the adaptation of TS 5/0.4kV "FAU 4", 2x1000kVA with connecting 5kV line according to the "turnkey" principle Lot 2: Execution of works on the adaptation of TS 5/0.4kV "RPV", 2xl000kVA with connecting 5kV line according to the "turnkey" principle Lot 3: Execution of works on the adaptation of TS 5/0.4kV "ZARNE PEÚ", 2x1600kVA with connection to the existing 5kV cable line according to the principle of inclusion in hands"