Scope Of Work: The Project For The Installation And Commissioning Of A New Water Pipe From The Water Tower To The Homes Of Mondercange Includes The Following Works: - Laying Of A Water Pipe From House No. 14 In Rue Des Prés To The Water Tower And Connections To The Existing Network As Well As To The Water Tower (Replacement Of The Existing Dn125 Grey Cast Iron Pipe); - 7 Connections For Drinking Troughs; - 5 Connections For Fire Hydrants; - Trench With: O Fd150 Water Pipe (1,764 M In Total), O 1X Ø125 Creos Ducts (1,778 M In Total), O 3X Ø125 Reserve Ducts For Ac (1,778 M In Total) - Part Of The Cycle Path In Non-Reinforced Concrete Cast On Site And Repair Of The Two Layers Of Asphalt For The Seam Path Start Of Work: March 2025 Duration Of Work: 200 Working Days