Search

1. Previous Works Of Removal Of The Existing Wall And Conditioning Of The Margin Of Land In A Length Of 130.00M, Extending It Towards The Interior Of The Plot To An Approximate Width Of 2.00M In Order To Be Able To Insert New Rows Of Rockery With Dimensions Greater Than The Existing Stone. The Extracted Land Will Be Relocated On The Same Plot According To The Instructions Of The Df. 2. Construction Of A New Margin Wall Made With Rock Of An Average Height Of 2.50M, Composed Of Rows Placed By Mechanical Means And Embedded In A Trench Previously Executed In Order To Ensure Its Settlement. The First Row Of Rock Stones Will Be Joined With Mortar Between The Pieces That Make Up The Wall And With The Upper Row, In Order To Ensure Its Stability. The Rows Will Be Set Back From Each Other By The Appropriate Proportion So That The Wall Remains Gravitationally Stable. 3. The Soil On Top Of The Wall Will Be Conditioned, So That It Will Be Stabilized And Compacted, Leaving The Edge Of The Plot Completely Profiled.

spn

General Information

   Oct 3, 2024
   Spanish
   Other
49518 EUR
   published: Oct 3, 2024

Original Text

CPO 02-20241. Treballs previs de retirada del mur existent i condicionament del marge de terra en una longitud de 130,00m, ampliant-lo cap a l’interior de la parcel·la fins a una amplada aproximada de 2,00m per tal de poder inserir noves filades de rocalla de dimensions superiors a la pedra existent. Les terres extretes es reubicaran en la mateixa parcel·la segons indicacions de la DF.

2...
Subscription Options

Basic

Full

Corporate

$550/year

$1000/year

Price on request

Buy Buy Contact Us
Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any suggestions for updates/corrections for this notice, please let us know.